Date de publication: 19 septembre 2018
Promoteur – Intermédiaire Financier
NATIONAL AUTHORITY FOR TUNNELSLieu
Description
The project consists of the rehabilitation of a 13.8-km long tram line in Alexandria, Egypt, including grade separating parts of the tracks as well as the purchase of new rolling stock.
Objectifs
This project is foreseen to be part of the Economic Resilience Initiative (ERI) of the Bank aiming at reinforcing the economic resilience in the Southern Neighborhood countries and developing the economic and social infrastructure thus creating sustainable growth and job creation.
Secteur(s)
- Transports - Transports et entreposage
Montant BEI envisagé (montant approximatif)
EUR 138 million
Coût total (montant approximatif)
EUR 592 million
Aspects environnementaux
The Bank requires the promoter to ensure, that the environmental and social procedures are in conformity with the applicable rules of the Bank.
Passation des marchés
The Bank requires the promoter to ensure, that the procurement procedures are in conformity with the applicable procurement guidelines of the Bank.
Statut
À l'examen - 9/02/2018
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).