Date de publication: 6 février 2020
Promoteur – Intermédiaire Financier
MOROCCAN AGENCY FOR SUSTAINABLE ENERGYLieu
Description
This project, concerning the Midelt Solar Complex, located near the city of Midelt, will finance the construction and operation of two hybrid photovoltaic/concentrated solar power (PV-CSP)plants with storage of ca. 500 MW each (total gross capacity of up to ca. 1000 MW). After the Ouarzazate complex, this is the second programme launched by MASEN under the NOOR Plan. Additionally, it is the first one using both PV and CSP technologies.
Objectifs
The PV-CSP hybrid solution will optimise the operating parameters of the plants, by enabling the electricity supply after sunset while providing a low-cost solution for daytime generation.
Secteur(s)
- Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Garantie au titre du MPE
This operation is covered by the ELM Guarantee.
Montant BEI envisagé (montant approximatif)
EUR 387 million
Coût total (montant approximatif)
EUR 2676 million
Aspects environnementaux
Details of the Environmental Impact Assessment (EIA) procedures will be reviewed during appraisal, in particular the procedures for ensuring compliance with the EIB standards and principles of EU directives.
Passation des marchés
The promoter has to ensure that the project implementation will be done in line with the EIB's Guide to Procurement.
Statut
Signé - 21/12/2018
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.