Date de publication: 20 mars 2018
Promoteur – Intermédiaire Financier
CITY OF RUDA SLASKALieu
Description
The project consists of the new construction of a 6.9-km long dual carriageway between the DTS (Drogowa Trasa ?rednicowa) road and motorway A4 (Trans-European Transport Networks - TEN-T) in Poland.
Objectifs
The project will reduce congestion, travel time and road accidents, eliminate conflicts between transit and local traffic, improve accessibility to TEN-T, and improve the urban environment. It is aligned with the city's comprehensive strategic framework and sustainable mobility plan. It is also contributing to the priorities in the regional development strategy for Silesia Province for 2014-2020, and with EU and national development policies.
Secteur(s)
- Transports - Transports et entreposage
Montant BEI envisagé (montant approximatif)
PLN 110 million (EUR 26 million)
Coût total (montant approximatif)
PLN 387 million (EUR 92 million)
Aspects environnementaux
The project falls under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended) and was screened in for EIA. The promoter has duly applied the relevant environmental procedures on the project, and environmental decisions for the project were issued by the competent authority, the regional Director of Environmental Protection for the Upper Silesia Region, as follows: for Stage 1 on 26th July 2007 (Decyzja Nr 29/2007); for Stage 2-3 on 15th May 2008 (Decyzja Nr 28/2008); and for Stage 4 on 2nd November 2016 (WOOS.4210.7.2015.JW28).
Passation des marchés
The Bank will require the promoter to ensure that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU, as well as Directive 89/665/EEC as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of the European Union, as and where required.
Statut
Approuvé - 18/12/2017
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).