Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20160569
Date de publication: 4 juillet 2016

Promoteur – Intermédiaire Financier

EUROPEAN SPALLATION SOURCE ERIC

Lieu

Description

Construction and operation of a multi-disciplinary research laboratory in Lund, Sweden, based on the world's most powerful neutron source

Objectifs

The European Spallation Source (ESS) will create a pan-European research infrastructure that will serve a community of 5 000 researchers across numerous research areas such as new materials (nanomaterials), energy and climate (fuel cells, batteries, biofuels, solar energy and superconductors), health (tissues, proteins, enzymes and other complex biological materials), engineering (catalysers, aeroplane wings, automobile engines), chemistry (environmentally friendly detergents, paints, cleaners and lubricants), or environmental technology (improved knowledge of water treatment and cleaner industrial processes). The ESS is one of the strategic research infrastructure projects under the "Excellent Science" programme of Europe's Horizon 2020 strategy.

Secteur(s)

  • Services - Activités spécialisées, scientifiques et techniques

Montant BEI envisagé (montant approximatif)

EUR 200 million

Coût total (montant approximatif)

EUR 1843 million

Aspects environnementaux

The facility will require permits in line with the Swedish Radiation Protection Act, the Swedish Environmental Code and the Swedish Planning & Building Act. Radiation protection and safety will be carefully monitored by the regulatory authorities. The status of the authorisations will be assessed during appraisal of the project. Research infrastructure is not specifically mentioned in Directive 2011/92/EU on environmental impact assessment (EIA), though due to its size, the project could be covered by Annex II of the directive in relation to urban development. The Bank's services will verify during appraisal whether an EIA is required for any component of the project.

Passation des marchés

The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir. 2004/18/EC and Dir. 2007/66/EC), with publication of tender notices in the Official Journal of the EU, as and where required. Procurement issues will be reviewed during appraisal.

Statut

Signé - 29/11/2016

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Danemark Suède Services