The project consists of the construction of a 2x3 lanes motorway of approximately 4.2km, incorporating below river and land based tunnels. The project also includes lowered connections to the A20 motorway and elevated connections to the A15 motorway. The project is situated near the city of Rotterdam, the Netherlands.

Objectifs

The Blankenburg project is located on the comprehensive TEN-T road network. The project aims to increase capacity and improve road safety on sections of the Dutch motorway near Rotterdam and underlying road network with heavy traffic, and is being procured as a design-build-finance-maintain (DBFM) public-private partnership (PPP).

Commentaires

The total project cost is estimated at approximately EUR 1 bn.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 328 million

Coût total (montant approximatif)

EUR 904 million

Aspects environnementaux

The project consists of a new 2x3 motorway 4.2 km long, connecting two existing motorways (A15 and A20), therefore it falls under Annex I of the EIA Directive 2011/92/EU. Compliance with the EIA Directive, the Habitats Directive (92/43/EEC) and Birds Directives (79/409/EEC) and NATURA 2000 will be verified in detail during appraisal.

Passation des marchés

The tender process was launched in May 2016, 3 letters of interest were then received in June 2016, and in July 2016 a Competitive Dialogue process started with the bidders. Final offers and Contract award together with Financial Close are expected to happen during 2017. The Concession will include design, construction, financing, and maintenance. Procurement procedures and compliance with Directive 2004/18/EC will be verified in detail during appraisal.

Statut

Signé - 17/10/2018

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Pays-Bas Transports