Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20160766
Date de publication: 21 octobre 2019

Promoteur – Intermédiaire Financier

MUNICIPIUL BUCURESTI - SECTORUL 4

Lieu

Description

The loan will finance the 3rd phase of "Bucharest Sector 4 thermal rehabilitation programme". This project falls under the Smart Finance for Smart Buildings (SFSB), a joint initiative of the EIB Group and the European Commission (EC) to support energy efficiency investments in buildings.

Objectifs

The project will improve the energy efficiency of 181 homeowners associations located in Bucharest Sector 4. The project targets 475 buildings and will focus on thermal energy efficiency improvements of the building envelope (wall, roofs and cellar insulation), window replacement, improvements in the heating and domestic hot water systems and replacement of indoor lighting located in common spaces.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 28 million

Coût total (montant approximatif)

EUR 106 million

Aspects environnementaux

This operation is expected to produce environmental benefits by supporting measures which reduce energy consumption, and help to mitigate climate change. The works on the buildings to be rehabilitated are expected to have limited negative environmental impact during construction. Given the scale, location and nature of the sub-projects an environmental impact assessment (EIA), as defined under the EIA Directive 2014/52/EU amending the 2011/92/EU, is normally not required. The operation will comply with the requirements of the Energy Performance of Buildings Directive 2010/31/EU.

Passation des marchés

The promoter is a public entity and therefore public procurement rules will apply, therefore it is required that all contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable national and EU procurement legislation (Directive 2014/24/EU and Directive 2007/66/EC), which may include publication in the Official Journal of the European Union (OJEU) where appropriate.

Statut

Signé - 11/12/2019

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Roumanie Industrie