Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20160951
Date de publication: 1 juin 2018

Promoteur – Intermédiaire Financier

MUNICIPIUL BUCURESTI - SECTORUL 2

Lieu

Description

The project consists of the financing of the 3rd phase of Bucharest Sector 2's thermal rehabilitation programme to improve energy efficiency in 400 residential buildings located in Bucharest Sector 2. This project falls under the Smart Finance for Smart Buildings ("SFSB") Initiative, a joint initiative of the EIB Group and the European Commission (EC) aiming at supporting Energy Efficiency investments in buildings.

Objectifs

This investment concerns the third phase of the refurbishment programme of multi-family housing in the municipality of Sector 2 in Bucharest and it will contribute to the SFSB (Smart Finance for Smart Buildings) initiative. Approximately 400 buildings shall be refurbished. The project will focus on thermal energy efficiency improvements of the building envelope (wall insulation, windows, roofs and cellar insulation) as well as optimisation of the heating systems.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 62 million

Coût total (montant approximatif)

EUR 99 million

Aspects environnementaux

This operation intends to bring environmental benefits by supporting measures, which reduce energy consumption, and help to mitigate climate change. The buildings to be rehabilitated are expected to have limited negative environmental impact during construction. Given the scale, location and nature of the sub-projects an environmental impact assessment (EIA), as defined under the EIA Directive 2014/52/EU amending the 2011/92/EU, is normally not required. The operation will comply with the requirements of the Energy Performance of Buildings Directive 2010/31/EU.

Passation des marchés

The promoter is a public entity and therefore public procurement rules will apply. The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable national and EU procurement legislation (Directive 2014/24/EU as well as Directives 89/665/EEC and 92/13/EEC), which may include publication in the OJEU where appropriate.

Statut

Signé - 4/10/2019

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Roumanie Industrie