Date de publication: 16 mars 2017
Promoteur – Intermédiaire Financier
PUBLIC ENTITY(IES)Lieu
Description
The framework programme is composed of two major components a) construction and refurbishment of a substantial number of student dormitories across the major university campuses in Hungary and b) major expansion and upgrading of two university campuses: one in Budapest and another in Pécs.
Objectifs
The project aims to enhance access to higher education by providing modern and affordable student accommodation. It will also contribute to national human capital formation and innovation capacity by expanding and refurbishing two major university campuses.
Secteur(s)
- Éducation - Enseignement
Montant BEI envisagé (montant approximatif)
EUR 92 million
Coût total (montant approximatif)
EUR 191 million
Aspects environnementaux
Universities and research institutions are not specifically mentioned in the Environmental Impact Assessment (EIA) Directive (2011/92/EU), as amended. An EIA is therefore not required by the directive. However, parts of the investments might be covered by Annex II of the directive in relation to urban development. The Bank's services will verify during appraisal whether an EIA is required for any component of the project. Potential impact on Natura 2000 conservation sites as well as operating procedures and systems related to animal testing, genetically modified organisms (GMOs), biosafety hazards and wastes management will also be checked. For new buildings the following EU directives on energy performance of buildings are applicable: (a) Directive 2010/31/EU on the energy performance of buildings and (b) Directive 2012/27/EU on energy efficiency. The design of the buildings with regard to energy performance and any specific targets to be met will be verified during appraisal.
Passation des marchés
The Bank will require the promoter to ensure that contracts for the implementation of the project have been and shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/24/EU as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.
Statut
Signé - 1/03/2018
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).