Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20170097
Date de publication: 28 septembre 2017

Promoteur – Intermédiaire Financier

ACCEPTABLE CORPORATE(S)

Lieu

Description

The project concerns the construction and operation of several onshore wind farms located in the Spanish region of Aragon. The capacity to be installed will be of 300MW and will be developed under the umbrella and as a result of the first Spanish renewables auction held in early 2016.

Objectifs

EIB financing for this operation is expected have an important acceleration and demonstration effect as it will be one of the first greenfield renewable energy projects to be financed in Spain after the moratorium in 2012 and the new regulatory framework, which came into effect in 2014. Besides, the present operation will contribute to the achievement of Spanish 2020 targets for renewable energy and to the reduction of the CO2 emissions.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

EUR 141 million

Coût total (montant approximatif)

EUR 298 million

Aspects environnementaux

Eight of the nine wind plants are included in the Annex II of the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending EIA Directive 2011/92/EU, and have been screened in, requiring full EIA including public consultation, while one wind farm, with capacity of 10 MW (only 3 wind turbines) has been screened out. Additionally, the presence of a 28 km 220 kV aerial power line, included in Annex I of the above-mentioned directive, required for the connection to the grid of certain plants, is subject to a separate EIA process. At this time, only two of the nine plants have received the environmental consent, and the rest of the processes, including for the transmission line, are still ongoing. The authorisation procedure and compliance with EIA, Birds and Habitats Directives will be further appraised in detail, in particular the need for cumulative impact assessment and the impact on protected flora and fauna, including adjacent Natura 2000 sites.

Passation des marchés

The Bank will require the promoter to ensure that contracts for the implementation of the project are tendered in accordance with the relevant applicable EU procurement legislation: Directive 2014/23/EU, 2014/24/EU or 2004/18/EC, 2014/25/EU or 2004/17/EC, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Statut

Signé - 25/04/2018

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Espagne Énergie