Date de publication: 1 septembre 2017
Promoteur – Intermédiaire Financier
PUBLIC ENTITY(IES), CITY OF CZESTOCHOWALieu
Description
The project will support eligible investment schemes in selected cities of the Silesia region. The loan will be structured as a Programme Loan for sub-loans supporting cities in the region.
Objectifs
The project is expected to support urban development and infrastructure modernisation including climate action components. This will be achieved through investments mainly in the areas such as transport, water and waste, health, education, culture and other public infrastructure and services, including energy efficiency measures.
Secteur(s)
- Transports - Transports et entreposage
- Aménagement urbain - Construction
Montant BEI envisagé (montant approximatif)
PLN 800 million (EUR 189 million)
Coût total (montant approximatif)
PLN 2000 million (EUR 473 million)
Aspects environnementaux
Poland, as an EU Member State, has harmonised its environmental legislation in line with the relevant EU Directives 2011/92/EU Directive and 2001/42/EC). The bank's appraisal will focus on the promoter's environmental management capacity to properly apply the EU Strategic Environmental Assessment (SEA) directive 2001/42/EC, the EU Environmental Impact Assessment (EIA) Directive 2011/92/EU, as well as the requirements of the Habitats and Birds Directives where appropriate. Compliance with the EU Directive on the Energy Performance of Buildings (recast) (2010/31/EU) will be further examined during appraisal.
Passation des marchés
The bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/23/EU or 2004/18/EC, where applicable, as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.
Statut
Approuvé - 18/10/2017
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).