Date de publication: 3 décembre 2018
Promoteur – Intermédiaire Financier
JP SRBIJAGAS NOVI SADLieu
Description
The project consists of the construction of the Serbian section of a gas interconnector between Serbia and Bulgaria to allow for the transfer of between 1 and 1.8 billion cubic metres of natural gas annually from Bulgaria to Serbia and 0.15 billion cubic meters from Serbia to Bulgaria. The project will contribute to diversification of supply routes and potential supply sources of natural gas to South-East European region.
Objectifs
The project aims to provide diversification of gas supply routes and sources to the Serbian and South East Europe gas market and to improve market integration and security of supply to both Serbia and Bulgaria.
Secteur(s)
- Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Garantie au titre du MPE
This operation is covered by the ELM Guarantee.
Montant BEI envisagé (montant approximatif)
EUR 25 million
Coût total (montant approximatif)
EUR 86 million
Aspects environnementaux
The Bulgaria-Serbia gas interconnector project is part of the "Energy Sector Development Strategy of the Republic of Serbia", which went through a Strategic Environmental Assessment process. At the feasibility stage an international consultant performed an Environmental and Social Impact Assessment (ESIA) of the project. The environmental permitting process is still ongoing with plans to be completed by the end of 2018. The pipeline route is proposed outside populated areas and in a way to avoid environmentally sensitive areas to the extent possible. It passes through largely agricultural land and forested areas. Impacts that can be typically expected are mainly temporary and relate to construction works. These impacts can usually be well managed by appropriate measures taken by the construction company in order to avoid unacceptable nuisance to other parties and the public. An assessment of the environmental procedures and capabilities of the Promoter, the potential environmental and social impacts of the Project along with checking alignment with the relevant EU Directives will be carried out during the appraisal.
Passation des marchés
The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.
Statut
Signé - 20/05/2021
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).