Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20170330
Date de publication: 6 septembre 2017

Promoteur – Intermédiaire Financier

BRIANZACQUE SRL

Lieu

Description

Investments in water and wastewater infrastructure in the Province of Monza and Brianza (Lombardy Region) during the period 2017 - 2021.

Objectifs

The project is driven by the need to ensure compliance with the EU and national environmental legislation. The investments will deliver substantial health advantages and environmental quality improvements in the form of a more rational use of water resources, higher ecological quality of surface and groundwater resources, and increased service coverage and quality. Moreover, the project is expected to increase resilience to the effects of climate change, and to generate energy savings, thereby contributing to climate change adaptation and mitigation.

Secteur(s)

  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

Montant BEI envisagé (montant approximatif)

EUR 50 million

Coût total (montant approximatif)

EUR 126 million

Aspects environnementaux

The investments in the water and wastewater sector are expected to have positive net environmental and social impact, considering their focus on compliance and resource efficiency. Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 2014/52/EU, amending Directive 2011/92/EU, the Habitats Directive (92/43/EC) and the Birds Directive (79/409/EEC) will be respected and the Bank will publish the full text of the relevant EIAs on its website.

Passation des marchés

The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU and Directive 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU (OJEU), as and where required.

Statut

Signé - 6/11/2017

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Italie Eau, assainissement