Date de publication: 18 octobre 2017
Promoteur – Intermédiaire Financier
THE CITY OF ZABRZELieu
Description
The project will support eligible investment schemes in line with the development strategy of the City of Zabrze (Poland) in the 2017-2022 period. It will focus on urban development and modernisation of municipal infrastructure. The loan will be signed under the Programme Loan SILESIA URBAN INFRASTRUCTURE PROGRAMME (2017-0117).
Objectifs
The proposed municipal framework loan will support eligible schemes coherent with the Development Strategy (2008-2020) and included in the Multi-annual Investment Plan (2017-2028) of the City of Zabrze. It will contribute to modernisation of public infrastructure and services, and sustainable urban development, particularly through investments in the sectors of urban roads and public transport, water, social, education, culture, sports and other public infrastructure and services, including energy efficiency measures.
Secteur(s)
- Transports - Transports et entreposage
- Aménagement urbain - Construction
Montant BEI envisagé (montant approximatif)
PLN 330 million (EUR 78 million)
Coût total (montant approximatif)
PLN 666 million (EUR 158 million)
Aspects environnementaux
The Bank will generally allocate its funds only to eligible schemes which are environmentally sound. All schemes must comply with EU environmental legislation as well as comply with the principles and standards of the Bank's Environmental Policy Statement. With the appropriate conditions in place the project is acceptable for financing in environmental and social terms.
Passation des marchés
The promoter is subject to the public procurement regime. The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation: Directive 2014/24/EU, as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU (OJEU), as and where required.
Statut
Signé - 12/12/2017
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).