Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20170625
Date de publication: 20 février 2018

Promoteur – Intermédiaire Financier

PUBLIC ENTITY(IES)

Lieu

Description

The project, located in the Walloon Brabant area of Belgium, concerns (i) the upgrade of water supply and solid waste collection infrastructure and (ii) eligible investments in public buildings.

Objectifs

The project will contribute to Environmental Protection, Natural Resource Efficiency as well as an integrated territorial development.

Commentaires

-

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 80 million

Coût total (montant approximatif)

EUR 180 million

Aspects environnementaux

The project's water supply components will contribute to ensure compliance with key EU directives in the water sector notably the Drinking Water Directive (98/83/CE) and the Water Framework Directive (2000/60/EC). The project's solid waste components shall be implemented in full compliance with the Solid Waste Framework Directive (2008/98/CE). The refurbishment of buildings shall be done in compliance with the EU Directive on Energy Performance of Buildings (2010/31/EU). Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by 2014/52/EU and the Strategic Environmental Assessment (SEA) Directive 2001/42/EC will be respected. The promoter will, in such case, prior to utilising any EIB funds, be responsible for transmitting to the Bank the non-technical summary of the EIA. For any parts of the project that may impact a nature conservation site, the promoter will be required to provide to the Bank an approval of the competent authority and information on the mitigating measures required to comply with the Habitats Directive 92/43/EEC.

Passation des marchés

The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/23/EU, 2014/24/EU or 2014/25/EU, where applicable, as well as Directives 92/13/EEC and 89/665/EEC) as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of the European Union, as and where required.

Statut

Signé - 18/12/2019

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Belgique Eau, assainissement Déchets solides Aménagement urbain Infrastructure composite