Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20170647
Date de publication: 13 décembre 2017

Promoteur – Intermédiaire Financier

GREENALIA SA

Lieu

Description

The project concerns the construction of a 50 MWe electricity only biomass plant in Galicia, Spain. The plant will use 100% forestry residues in wood chip form, which will be sourced from the region in a 100 km radius around the plant.

Objectifs

The generation of electricity using renewable sources supports the EU objective of climate change mitigation. By ensuring demand for forest wood residues, the project will provide potential mitigation against incidences of forest fires in the region of influence, and will contribute to the sustainability of its forestry and overall economic activity.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

EUR 60 million

Coût total (montant approximatif)

EUR 130 million

Aspects environnementaux

The project falls under Annex II of the EIA Directive 2011/92/EC, leaving it to the competent national authority to determine the need for an Environmental Impact Assessment (EIA). The project has undergone an EIA which has been completed and has been submitted to the competent authorities. The promoter is expecting environmental permit to be issued before the end of 2017. The Bank will assess environmental aspects of the project during appraisal.

Passation des marchés

The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if after the project appraisal the EIB were to conclude that the promoter is after all subject to EU public procurement legislation Directive 2014/23/EU / 2014/24/EU or 2004/18/EC / 2014/25/EU or 2004/17/EC, where applicable, then the Bank would require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation referenced above as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the European Union, as and where required.

Statut

Signé - 25/07/2018

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Espagne Énergie