Date de publication: 12 octobre 2017
Promoteur – Intermédiaire Financier
SOFIA MUNICIPALITYLieu
Description
Investment loan for the construction of the first stage of Sofia Metro line 3. The project is a twin-track metro line approximately 7.8km in length and includes eight metro stations, a train depot and the supply of associated rolling stock (20 trains) and control system.
Objectifs
The project will enhance the public transport network of the City of Sofia in line with the EU priority to promote sustainable transport. It will help reduce reliance on private cars and increase public transport share, therefore contributing to climate change mitigation. The investment is also expected to have a positive impact on the economic and social cohesion of a priority region.
Secteur(s)
- Transports - Transports et entreposage
Montant BEI envisagé (montant approximatif)
EUR 56 million
Coût total (montant approximatif)
EUR 288 million
Aspects environnementaux
It is a requirement that all sub-projects must be implemented in compliance with EU environmental legislation and the promoter has identified those sub-projects for which it considers an environmental impact assessment (EIA) is required. Should any sub-project have a negative impact on an area forming part of the Natura 2000 network (falling under the Habitats Directive 92/43/EEC or Birds Directive 2009/147/EC), the Bank would require the promoter to act according to the provisions of the aforementioned directives as transposed into national law. These matters will be clarified during the appraisal.
Passation des marchés
The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC, 2004/17/EC or 2014/24/EU where applicable as well as Directives 89/665/EEC and 92/13/EEC, as amended) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the European Union, as and where required.
Statut
Signé - 29/12/2017
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).