Date de publication: 15 mai 2018
Promoteur – Intermédiaire Financier
PORI ENERGIA OYLieu
Description
The project concerns deployment of a Combined Heat and Power (CHP) biomass-fired plant of capacity 15 MWe (electric) and 80 MWth (heat and steam) in Finland. The aim is to replace an existing solid fuel (peat and biomass) plant in order to meet the requirements of the Industrial Emissions Directive. The old fuel oil based unit is not up to modern emission standards of the Industrial Emissions Directive 2010/75/EU and needs to be replaced.
Objectifs
The project is part of the Transitional National plan by which the existing plant, with a fuel switch to light fuel oil, can continue operation to June 2020. The entire electricity produced by the plant will be cogenerated at high efficiency as defined by the EU directives.
Secteur(s)
- Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Montant BEI envisagé (montant approximatif)
EUR 30 million
Coût total (montant approximatif)
EUR 64 million
Aspects environnementaux
With a thermal capacity below 300 MWth, the Project does not fall under Annex 1 of the Environmental Impact Assessment (EIA) Directive 2014/52/EU which amends Directive 92/2011/EU, thereby, adhering to Annex 2 of the said Directive and the Finnish EIA Law, leaving it to the competent authority to decide if an EIA is required. The project has been screened out by the competent authority and an environmental permit has been granted based on environmental studies, including pollution distribution models. With a thermal capacity of over 50 MW the project is however subject to the provisions of the Industrial Emissions Directive 2010/75/EU. These have been reviewed by the competent authority in the Environmental permit that was awarded in October 2017.
Passation des marchés
The promoter is a public undertaking in the utility sector that follows public procurement procedures as required by Directive 2014/25/EU. Procurement for the Project has started with publication in the Official Journal. The procurement procedures will be further assessed during appraisal.
Statut
Signé - 20/12/2018
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).