Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20170832
Date de publication: 8 mars 2018

Promoteur – Intermédiaire Financier

PROXIMUS SA DE DROIT PUBLIC

Lieu

Description

The project relates to the design, building, operation and commercialisation of an ultra-high speed fixed broadband telecommunications' network, mainly relying on the Fibre-to-the-Home (FTTH) and Fibre-to-the-Business (FTTB) technology, starting from 2018 up until the end of 2020. The goal is to reach an additional coverage of 10% in residential areas and 38% of the enterprise addressable units in Belgium, leading to an increase of 487 000 homes and 57 810 businesses. In addition, the project includes fibre deployment to street cabinets in rural zones, necessary IT development, a backbone upgrade to sustain the increasing bandwidth usage, fibre customer premise equipment (CPE's) and Cybersecurity enhancements to secure the infrastructure.

Objectifs

The proposed investments are expected to increase broadband penetration rates, including in convergence areas with lower access ratios as well as result in significant improvements in service quality.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 400 million

Coût total (montant approximatif)

EUR 811 million

Aspects environnementaux

Investments in fixed telecommunications projects (mainly civil works for fibre rollout) do not fall under the Environmental Impact Assessment (EIA) Directive 2011/92/EC as amended. The related works have limited environmental effects, apart from disturbances during civil work constructions, which can be mitigated by appropriate measures.

Passation des marchés

The promoter has been assessed by the EIB as a company neither operating in the utilities sector nor having the status of a contracting entity, thus not subject to EU rules on public procurement. However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation (i.e. Directive 2014/25/EU), then the Bank would require the promoter to ensure that contracts for the implementation of the project have been/will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU and Directive 92/13/EEC), with the publication of tender notices in the Official Journal of the European Union, as and where required.

Statut

Signé - 2/03/2018

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Belgique Télécom