Référence: 20170862
Date de publication: 4 mai 2018

Promoteur – Intermédiaire Financier

TAMPEREEN SEUDUN KESKUSPUHDISTAMO OY

Lieu

Description

The project concerns the construction of a wastewater treatment plant in Tampere, Finland.

Objectifs

The investments in wastewater treatment infrastructure will improve the current treatment processes by increasing the quality of the treated wastewater discharge. It also includes improvements in the overall collection system which aim to reduce the amount of inflows to be treated at the plant. The project is therefore eligible under article 309 c) Common Interest (Environment).

Secteur(s)

  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

Montant BEI envisagé (montant approximatif)

EUR 150 million

Coût total (montant approximatif)

EUR 314 million

Aspects environnementaux

The investment is geared toward the implementation of a new waste water treatment plant, bringing about positive environmental impacts. Compliance with the EU Water Framework Directive (2000/60/EC), Urban Waste Water Treatment Directive (91/271/EEC), and EU and national environmental legislation (notably under Directives 2011/92/EU, 92/43/EEC (Art. 6.3), 2000/60/EC (Article 4.7), Directive 2010/75/EU, the Environmental Impact Assessment (EIA) Directive 2014/52/EU, the Birds Directive 2009/147/EC and the Habitats Directive 92/43/EEC) will be verified during the appraisal.

Passation des marchés

The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, 2014/25/EU, where applicable, as well as Directive 92/13/EEC as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of European Union, as and where required.

Statut

Signé - 20/02/2019

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Finlande Eau, assainissement