Date de publication: 11 avril 2018
Promoteur – Intermédiaire Financier
CONSEIL DE DEVELOPPEMENT ET DE RECONSTRUCTIONLieu
Description
The project consists of the construction of wastewater networks in the area of Tripoli city conveying sewerage to the existing wastewater treatment plant.
Objectifs
The proposed operation will improve the sanitation services for some 900 000 habitants of Tripoli, Lebanon's second largest city. The Tripoli waste water project was identified over twenty years ago as a priority operation within the Government's Coastal Pollution Control Programme targeted at achieving compliance with the Barcelona Convention and the Genoa Declaration. This sanitation project is a priority project under the EC Horizon 2020 initiative, which aims to de-pollute the Mediterranean. It is also fully compatible with the objectives of the Mediterranean component of the EU Water Initiative, which promotes better water governance and coordination between stakeholders.
Secteur(s)
- Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
Garantie au titre du MPE
This operation is covered by the ELM Guarantee.
Montant BEI envisagé (montant approximatif)
EUR 92 million
Coût total (montant approximatif)
EUR 107 million
Aspects environnementaux
The project will have a positive impact on public health and the environment by reducing the discharge of untreated waste water to the Mediterranean Sea. Inside the EU, the project components would be categorised under Annex II and therefore would be subject to environmental screening to define if an Environmental Impact Assessment (EIA) would be required according to the relevant competent authority. In most cases, waste water networks in urban areas are screened out. Climate change aspects will be examined during the appraisal. The Bank will assess the social aspects of the project during appraisal to ensure adherence to its social standards.
Passation des marchés
The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.
Statut
Signé - 11/11/2019
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).