Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20180008
Date de publication: 13 avril 2018

Promoteur – Intermédiaire Financier

LAND BRANDENBURG

Lieu

Description

The proposed Framework Loan will be the third social housing operation in the region of Brandenburg with the counterpart Investitionsbank des Landes Brandenburg (ILB). The operation concerns the financing of the ILB's social housing programmes. The investments will include renovation and construction of social housing units throughout local authorities, social housing associations, municipal housing associations and housing cooperatives in Brandenburg.

Objectifs

The proposed operation is expected to comprise comprehensive retrofitting and the adaption of existing social housing units as well as some possible construction or reconstruction of rented social housing. The investments will need to satisfy the EIB's eligibility criteria for urban renewal and sustainable communities. The housing investments are anticipated to form part of specific local integrated urban development plans (Integrierte Stadtentwicklungskonzepte - INSEKs).

Commentaires

under appraisal

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 275 million

Coût total (montant approximatif)

EUR 590 million

Aspects environnementaux

Compliance with the relevant EU directives will be verified during appraisal: Environmental Impact Assessment (EIA) Directive 2011/92/EU, Strategic Environmental Assessment (SEA) Directive 2001/42/EC, EU Habitats Directive 92/43/EEC and EU Birds Directive 2009/147/EC. The status of any environmental studies and public consultations related to the housing investments will be reviewed during the project's appraisal. Applicable energy efficiency requirements in line with the EU Directive on the Energy Performance of Buildings 2010/31/EU will also be further assessed during the appraisal.

Passation des marchés

The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of the European Union, as and where required.

Statut

Signé - 22/11/2018

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Allemagne Aménagement urbain