Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20180070
Date de publication: 19 septembre 2018

Promoteur – Intermédiaire Financier

SOCIETE NATIONALE DES AUTOROUTES DU MAROC

Lieu

Description

The project consists of the widening of the Casablanca-Berrechid motorway (25.8 km) and the Casablanca motorway bypass between the Mohammedia and the Lissasfa interchanges (31.7 km), from 2x2 lanes to 2x3 lanes.

Objectifs

The project addresses traffic growth and improves transport conditions and road safety. Both investments that make up the project aim at improving level of service, relieving congestion, for both commuting and transit traffic through and from Casablanca (the second largest city in the Maghreb region). The project meets the Bank's priority objectives for transport lending and is in line with the Bank's objectives.

Secteur(s)

Garantie au titre du MPE

This operation is covered by the ELM Guarantee.

Montant BEI envisagé (montant approximatif)

EUR 80 million

Coût total (montant approximatif)

EUR 206 million

Aspects environnementaux

The project involves two investments generally expected to be implemented within existing rights of way through both urban and rural areas; therefore potential negative environmental and social impacts are likely to be minor and temporary. If situated in the EU, the schemes would likely fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU. Two individual environmental impact assessments are already finalised for each of the two project components. The Bank shall investigate environmental and social aspects during appraisal and verify that the promoter has followed the relevant EU environmental and social principles, standards and practices. The Bank shall also verify the acceptability of the project in terms of likely environmental impacts and proposed mitigation and compensation measures.

Passation des marchés

The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

Statut

Signé - 4/01/2019

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Maroc Transports