Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20180128
    Date de publication: 22 novembre 2022

    Promoteur – Intermédiaire Financier

    APDL - ADMINISTRACAO DOS PORTOS DO DOURO LEIXOES E VIANA DO CASTELO SA

    Lieu

    Description

    Improvement of the maritime accessibility and extension of the breakwater of the Port of Leixões in the North of Portugal.

    Additionality and Impact

    The project improves the maritime access of a Core TEN-T port and allows the further development and expansion of the port. The project will increase the efficiency and safety of port operations and allows larger vessels to enter the port. The availability of high quality port facilities that can accommodate deep sea vessels and are well connected to the hinterland allows importers and exporters to optimise their supply chain and increases their competitiveness. The project supports a modal shift from more carbon intensive transport modes to maritime transport and reduces hinterland transport distances. The shift to more sustainable multi-modal transport chains reduces negative transport externalities like congestion, accidents and emissions in the wider region.


    EIB financing will contribute to diversify the company's funding sources and lengthen the average maturity of the company's debt, while providing the necessary flexibility to implement the project in terms of drawdowns and availability period.

    Objectifs

    The project will enhance the maritime accessibility to the existing port facilities, allowing bigger vessels to call at the port, reducing waiting times and, consequently, alleviating operational and safety constraints. The project will also allow a further development of the outer port. The project will contribute to the competitiveness of the port and of the region, and foster a more sustainable growth.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 60 million

    Coût total (montant approximatif)

    EUR 190 million

    Aspects environnementaux

    Compliance with the SEA Directive 2001/42/EC, the EIA Directive 2014/52/EU amending the EIA Directive 2011/92/EC, the Habitats Directive 92/43/EEC, the Birds Directive 2009/147/EC, the Water Framework Directive 2000/60/EC, as well as biodiversity assessment requirements, climate change adaptation issues, mitigation/compensation measures and environmental and social monitoring plans, will be assessed during appraisal and/or allocation phase for each project component, whenever applicable.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU, where applicable, as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU (OJEU), as and where required. The main works contract has been announced in the OJEU under reference 2019/S 040-089352.

    Statut

    Signé - 25/05/2023

    Milestone
    À l'examen
    Approuvé
    Signé
    21 décembre 2022
    25 mai 2023

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Portugal Transports