Référence: 20180237
Date de publication: 19 octobre 2018

Promoteur – Intermédiaire Financier

SOCIETATEA NATIONALA DE TRANSPORT GAZE NATURALE TRANSGAZ SA

Lieu

Description

The project comprises the construction of new onshore natural gas transmission pipeline, which will connect the gas production from the Black Sea with the BRUA (Bulgaria, Romania, Hungary, Austria) gas corridor.

Objectifs

This project will enhance the security of gas supply in the European Union.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

EUR 150 million

Coût total (montant approximatif)

EUR 360 million

Aspects environnementaux

The project falls under Annex I of the Environmental Impact Assessment (EIA) Directive, the environmental impact assessment process has been completed, and the promoter has received the environmental and construction permits. The pipeline will be routed to avoid environmentally sensitive areas to the extent possible and to follow existing rights of way where appropriate, thus maintaining the integrity of sensitive zones. The impact that can typically be expected is mainly temporary, related to construction works and can usually be well managed by appropriate construction measures. An assessment of the potential environmental and social impacts along with checking alignment with the EIA Directive, as well as with the Habitats and Birds Directives (2009/147/EC and 92/43/EEC, respectively) will be carried out during the appraisal.

Passation des marchés

The investments fall under EU public procurement legislation. The Bank will review with the promoter the proposed procurement procedures and will require the promoter to ensure that contracts for the implementation of the program have been/shall be tendered in accordance with relevant applicable EU procurement legislation.

Statut

Signé - 17/12/2018

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Roumanie Énergie