Date de publication: 1 avril 2019
Promoteur – Intermédiaire Financier
RENFE OPERADORALieu
Description
the project consists of the acquisition of 31 trainsets (26 electric and five hybrid) to replace ageing rolling stock in metric gauge rail network of Asturias, Cantabria and Vizcaya in Spain.
Objectifs
The project supports the shift of traffic to more sustainable transport modes and reduces related negative transport externalities The project is expected to generate operating and maintenance costs savings. It should also improve the quality and comfort of the services, thus ensuring accessibility to rural areas in these regions. As one of the pillars of the plan for improvement of suburban services, fleet renewal will foster modal shift from road to rail (or at least maintain rail modal share) and therefore contribute to the reduction of accidents, pollution and noise levels especially within urban agglomerations, as well as CO2 emissions. The project will thus contribute to meeting the Bank's target for support to climate action. The project is eligible under Article 309 point (c) common interest. The project's compliance with the Lending Policy for Transport (Decision CA/452/11) is to be confirmed during the appraisal.
Secteur(s)
- Transports - Transports et entreposage
Montant BEI envisagé (montant approximatif)
EUR 150 million
Coût total (montant approximatif)
EUR 201 million
Aspects environnementaux
The investment proposed under the project does not fall under either Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU) as manufacturing and use of rail rolling stock is not included in either list. The need of EIA and/or assessment according to the Habitats Directive 92/43/EEC for associated facilities (e.g. maintenance workshops or depots), not included in the investment proposed but needed for the correct operation of the new rolling stock, will be analysed during the appraisal. Arrangements for the replacement or decommissioning of old rolling stock will be reviewed during appraisal. All else equal, the project is expected to have a positive environmental impact by contributing to modal shift from road to railways.
Passation des marchés
The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the European Union, as and where required.
Statut
Signé - 30/07/2019
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).