Date de publication: 7 novembre 2019
Promoteur – Intermédiaire Financier
REPUBLIC OF CROATIALieu
Description
The project aims to secure compliance with the Urban Wastewater Directive for the Vinkovci, Otok, Ivankovo and Cerna agglomerations. The project will provide additional 8,269 connections to the sewer system realizing an overall connection (coverage) rate in the agglomerations of around 85%. It will also upgrade treatment standards to tertiary levels to ensure compliance of discharges to a sensitive water course in the Black Sea area. The project has been reviewed by JASPERS.
Objectifs
The project will contribute to environmental protection and natural resource efficiency.
Secteur(s)
- Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
Montant BEI envisagé (montant approximatif)
EUR 6 million
Coût total (montant approximatif)
EUR 53 million
Aspects environnementaux
The project's components will contribute to ensure compliance with key EU directives in the water sector notably the Urban Waste Water Treatment Directive (91/271/EC) and the Water Framework Directive (2000/60/EC). Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by 2014/52/EU and Strategic Environmental Assessment (SEA) Directive 2001/42/EC will be respected. The promoter will in such case, prior to utilising any EIB funds, be responsible for transmitting to the Bank the non-technical summary of the EIA. For any part of the project that may impact on a nature conservation site, the promoter will be required to provide to the Bank an approval of the competent authority and information on the mitigating measures required to comply with the Habitats Directive 92/43/EEC.
Passation des marchés
The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/23/EU, 2014/24/EU or 2014/25/EU, where applicable, as well as Directives 92/13/EEC and 89/665/EEC) as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of the European Union (OJEU), as and where required.
Statut
Approuvé - 2/06/2020
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).