Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20180730
    Date de publication: 7 novembre 2019

    Promoteur – Intermédiaire Financier

    REPUBLIC OF CROATIA

    Lieu

    Description

    The project covers the Zabok and Zlatar agglomerations, north-east of Zagreb. The agglomerations cover small to medium-sized municipalities. By minimizing discharges of wastewater pollutants, the main objectives of the project are achieving compliance with the Urban Wastewater Directive and the Water Framework Directive by extending and rehabilitating the public sewerage system and building two tertiary level wastewater treatment plants. The project has been reviewed by JASPERS.

    Additionality and Impact

    The project aims at supporting investments in water and sanitation infrastructure, in order to improve the coverage, quality and resilience of integrated water services in several regions across Croatia. In doing so, the projects will contribute to ensuring compliance with key European policy and regulations in the water sector, also with national water legislation, thereby supporting the Bank's Policy Objective on Sustainable Energy and Natural Resources. The projects will also contribute towards the Bank's Policy Objective of Climate Action and Environmental Sustainability. The projects will address a number of market failures including those associated with unaccounted for externalities and information failures, generating environmental and public health benefits, notably through a more rational use of water and energy resources, improvements in the quality of recipient waters and improved resilience to the impacts of climate change. The proposed investments will increase employment opportunities, and will also contribute to improve the attractiveness of Croatia as a sustainable touristic destination. Finally, the project will create economic opportunities for the population and local businesses in a less developed region according to EU Cohesion Policy, thus contributing to the EU's economic social and territorial cohesion. These benefits would not be realised to the same extent without public intervention. JASPERS contribution with technical expertise and advice has been made available to the Promoter.


    The EIB's involvement will facilitate the absorption of EU Structural funds by securing national co-financing contributions of EU funded projects in Croatia. The EIB financing provides an essential financial contribution in the form of financial advantage that is currently not available in the market.

    Objectifs

    The project will contribute to environmental protection and natural resource efficiency.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Montant BEI envisagé (montant approximatif)

    EUR 10 million

    Coût total (montant approximatif)

    EUR 73 million

    Aspects environnementaux

    The project's components will contribute to ensure compliance with key EU directives in the water sector notably the Urban Waste Water Treatment Directive (91/271/EC) and the Water Framework Directive (2000/60/EC). Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by 2014/52/EU and Strategic Environmental Assessment (SEA) Directive 2001/42/EC will be respected. The promoter will in such case, prior to utilising any EIB funds, be responsible for transmitting to the Bank the non-technical summary of the EIA. For any part of the project that may impact on a nature conservation site, the promoter will be required to provide to the Bank an approval of the competent authority and information on the mitigating measures required to comply with the Habitats Directive 92/43/EEC.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/23/EU, 2014/24/EU or 2014/25/EU, where applicable, as well as Directives 92/13/EEC and 89/665/EEC) as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of the European Union (OJEU), as and where required.

    Statut

    Approuvé - 24/11/2022

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Croatie Eau, assainissement