Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20180778
Date de publication: 13 mars 2019

Promoteur – Intermédiaire Financier

FINAVIA OYJ

Lieu

Description

The project concerns Phase IV of the expansion of Helsinki International Airport (HEL) and includes the extension of Terminal 2 with new arrivals and departures halls, new gates, increased border control capacity for transfer traffic and enhanced public transportation links through a multimodal travel centre.

Objectifs

The project is intended to provide additional landside terminal capacity, alleviate bottlenecks in the Schengen area and in the landside transfers between the airport and rail, bus and taxi transport.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 150 million

Coût total (montant approximatif)

EUR 569 million

Aspects environnementaux

The project investments fall under Annex II of the Directive 2014/52/EU amending the Environmental Impact Assessment (EIA) Directive 2011/92/EU, meaning that the Competent Authority makes the decision as to whether a formal EIA is required or not. Compliance to this and to any other National and EU environmental legislation, including the Habitats and Birds Directives (92/43/EEC and 2009/147/EC respectively), the EU Water Framework Directive (2000/60/EC and 2006/118/EC) and the EU Directive on Energy Performance of Buildings (2010/31/EU), as well as the status of any pre-existing development consents will be reviewed and assessed during the appraisal.

Passation des marchés

The Bank will require the promoter to ensure that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2004/17/EC and 2014/25/EU, where applicable, as well as Directive 92/13/EEC, as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

Statut

Signé - 8/11/2019

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Finlande Transports