Référence: 20190235
Date de publication: 14 février 2020

Promoteur – Intermédiaire Financier

UAB LORDS LB ASSET MANAGEMENT

Lieu

Description

The project is part of an EIB Programme Loan (2018-0211) that includes a portfolio of 66 independent, small scale, land based photovoltaic (PV) plants. The PV plants, which have an individual nominal capacity of about <=1MW, totaling to ~66M, are geographically dispersed across central-northern Poland, covering areas in the West Pomeranian Voivodeship, Pomeranian Voivodeship, Warmian-Masurian Voivodeship and Kuyavian-Pomeranian Voivodeship, with a larger conglomeration in the first three regions.

Objectifs

The development of PV plants supports EU and national targets for renewable energy generation and contributes to the EIB's renewable energy and climate action objectives, as well as to EFSI. Additionally, as investments are located in Poland, the project supports cohesion in the EU.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

PLN 82 million (EUR 18 million)

Coût total (montant approximatif)

PLN 200 million (EUR 44 million)

Aspects environnementaux

Based on the currently available documentation of the promoter, it appears that the environmentally relevant conditionality set out for the Programme Loan is met for this sub-operation and thus the project would be acceptable for EIB financing in environmental and social terms.

Passation des marchés

The project will enjoy 15-year guaranteed offtake premium, determined by the Polish Energy Regulatory Office following a competitive public auctions. The support scheme under the Renewable Energy Act has received the European Commission's State Aid clearance. The promoter is a private company operating in the utility sector, therefore is not subject to the EU Public Procurement Directives, however it will be required to fulfil the principles of non-discrimination, transparency and fairness for its procurement operations.

Statut

Signé - 26/05/2020

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Pologne Énergie