Date de publication: 15 juin 2020
Promoteur – Intermédiaire Financier
HELLENIC REPUBLICLieu
Description
The EIB will finance an integrated investment programme, launched by the Ministry of Environment & Energy and the Ministry of Economy & Development, aiming to improve energy efficiency in public buildings and other venues (e.g. schools, hospitals and sports facilities). This project falls under the Smart Finance for Smart Buildings (SFSB) initiative, a joint initiative of the EIB Group and the European Commission (EC) aiming at supporting energy efficiency investments in buildings.
Objectifs
The EIB financing consists in an intermediated multi-beneficiary framework loan to enable final beneficiaries to invest in activities related to building retrofitting. This includes, for example, the replacement of frames, insulation measures, replacement of obsolete heating and cooling equipment, installation of renewable energy and building management systems, as well as interventions aiming to the enhancement of the static integrity of the buildings when necessary.
Secteur(s)
- Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Montant BEI envisagé (montant approximatif)
EUR 375 million
Coût total (montant approximatif)
EUR 714 million
Aspects environnementaux
It is expected that the sub-projects under this operation will not have any significant negative environmental or social impact and will not require an Environmental Impact Assessment (EIA) under the EU EIA Directive 2014/52/EU amending the EU EIA Directive 2011/92/EU. Nevertheless compliance with the relevant EU Directives will be verified during appraisal: EU EIA Directive 2014/52/EU amending the EU EIA Directive 2011/92/EU, EU SEA Directive 2001/42/EC, EU Habitats Directive 92/43/EEC and EU Birds Directive 2009/147/EC. The status of any environmental studies and public consultations related to the urban renewal, upgrading and construction investments will be reviewed during project appraisal. Energy efficiency requirements will also be further assessed during project appraisal to be in line with the EU Directive on the Energy Performance of Buildings Directive (2018/844/EU amending the Directive 2010/31/EU), and the Directive on Energy Efficiency 2018/2002/EU (amending the Directive 2012/27/EU).
Passation des marchés
The promoter has to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/24/EU, as well as Directive 89/665/EEC and 92/13/EEC (if relevant) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.
Statut
Signé - 22/12/2020
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).