Date de publication: 10 septembre 2020
Promoteur – Intermédiaire Financier
METSAE BOARD OYJLieu
Description
Replacement of recovery boiler, turbine generator and the installation of a black liquour superconcentrator at the Husum pulp mill in Sweden.
Objectifs
The replacement of the currently existing recovery boilers and associated steam and power generation by a new, more efficient system will peruse economies of scale and overall system modernisation to increase the electricity generation, while still meeting the overall heat demand of the existing integrated pulp and paper mill with similar thermal input. The project does not target an increase in mill's production capacity.
Secteur(s)
- Industrie - Industrie manufacturière
Montant BEI envisagé (montant approximatif)
EUR 125 million
Coût total (montant approximatif)
EUR 300 million
Aspects environnementaux
The project's compliance with all applicable national and EU environmental legislation will be verified during the appraisal. An environmental impact assessment will be carried out and mitigating and/or compensation measures applied as necessary.
Passation des marchés
The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the relevant applicable EU procurement rules.
Statut
Signé - 6/04/2020
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).