Date de publication: 10 octobre 2019
Promoteur – Intermédiaire Financier
NEOENERGIA SALieu
Description
The project consists of a Framework Loan to finance renewable energy projects in Brazil, promoted by Neoenergia.
Objectifs
The project is expected to contribute to the External Lending Mandate 2014-2020 objectives including climate change mitigation. The operation is well aligned with the United Nations Sustainable Development Goals 7 ("ensure access to affordable, reliable, sustainable and modern energy for all") and 13 ("take urgent action to combat climate change and its impacts"). The operation will also contribute to the EIB's priority objectives for energy sector lending related to renewable energy sources, in line with the EIB's Energy Lending Criteria and its Climate Action objectives.
Secteur(s)
- Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Garantie au titre du MPE
This operation is covered by the ELM Political Risk Guarantee.
Montant BEI envisagé (montant approximatif)
EUR 250 million
Coût total (montant approximatif)
EUR 500 million
Aspects environnementaux
If the plants were located within the EU they would fall under Annex II of the Environmental Impact Assessment (EIA)Directive (2014/52/EU amending the 2011/92/EU), requiring the competent authorities to determine whether an EIA is required. The capability of the Promoter to comply with the EIB's Environmental and Social standards will be assessed as part of the appraisal of the framework loan. The authorization procedure of each scheme and its compliance with the EIB's Environmental and Social standards and the principles of relevant EU Directives, will be verified at the appraisal of the individual schemes.
Passation des marchés
It is required that the promoter to ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement. The EIB will not finance plants for which the procurement process is impacted by local content requirements non-compliant with the above mentioned Guide to Procurement.
Statut
Signé - 4/12/2019
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).