Référence: 20190588
Date de publication: 2 janvier 2023

Promoteur – Intermédiaire Financier

COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE - SA

Lieu

Description

The project concerns the construction of a new 70 km 2x2 lanes motorway section of the D1 motorway between the motorway junction with the A1 near Sebes and the motorway junction with the A3 at Turda. The motorway aims to provide a link between the existing motorway sections A1 Orastie-Sibiu and A3 Gilau - Campia Turzii, with a total length of approx. 70 km, a design speed of 120 km/h, including 7 junctions, 4 service points, 4 rest areas, 1 maintenance and control centre, 1 maintenance and monitoring centre and 66 structures.

Additionality and Impact

The Project is located on the Core TEN-T Network in a Cohesion region of Romania. The Project addresses the market/network failures related to accessibility along the Core TEN-T Network, in particular the Rhine-Danube TEN-T CNC.

The Project will improve connectivity and accessibility as well as the traffic safety, offering a modern connection for the transit traffic between two important urban agglomerations of Romania: Cluj-Napoca and Sibiu.

The Project will serve local, regional and international traffic demand. The project has benefited from JASPERS and PASU Technical Assistance to the Managing Authority to prepare the EU funds application.

Romania will benefit from the advantageous financial conditions offered by EIB, including long tenors (up to 25 years) and attractive interest rates. Such conditions will allow Romania for a considerable financial flexibility in the implementation of its transport infrastructural investments (including the Sebes-Turda A10 highway) and contribute to the effective absorption of EU funds.

Objectifs

The new transport link will reduce congestion in the city centres along the corridor, notably by diverting most of the heavy goods vehicles, and enable further development of soft mobility options in the area. Enhancing travel time, reducing operating costs and improving travel safety (of vulnerable road users in particular).

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 112 million

Coût total (montant approximatif)

EUR 652 million

Aspects environnementaux

The EU and Romania national legal procedures have been properly followed in the project preparation and implementation. An Environmental Impact Assessment (EIA) has been completed and the competent authorities have issued environmental decisions and building permits.

Passation des marchés

The Promoter is a public contracting authority subject to the relevant EU directives. The procurement is following the principles of the Directives 2014/24/EC and 89/665/EC. The project works and service contracts have been procured through open tenders after international publication in the EU Official Journal.

Statut

Approuvé - 8/12/2022

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Roumanie Transports