Date de publication: 21 avril 2020
Promoteur – Intermédiaire Financier
MINISTERO DELLA DIFESALieu
Description
The project concerns the construction of three vessels (one large vessel and two smaller vessels) tasked with hydrographic dual-use research activities for the Italian Navy Hydrographic Office (Istituto Idrografico della Marina, IIM) in Genoa, Italy. EIB financing will support eligible costs occurred during the construction in the period 2021-2027. The large vessel (NIOM) will perform hydrographic activities in oceans and is meant to operate widely, including in the Arctic. The two smaller vessels (NIOC1 and NIOC2) will operate in the Mediterranean Sea and adjacent ones.
Objectifs
Through the renewal of the hydrographic fleet, the project will allow hosting more researchers as well as allow for state of the art hydrographic data collection and analysis. Additionally, it will contribute to increase the promoter's expertise and capacity in hydrographic monitoring and climate and maritime related research and to accelerate the accumulation and diffusion of knowledge in Europe, through the promoter's active collaboration with universities and research centres. The project will favour and enhance R&D in areas critical for climate and environment protection.
Commentaires
n/a
Secteur(s)
- Services - Activités spécialisées, scientifiques et techniques
Montant BEI envisagé (montant approximatif)
EUR 220 million
Coût total (montant approximatif)
EUR 444 million
Aspects environnementaux
The construction of seagoing vessels does not require an Environmental Impact Assessment (EIA) under Annex II of the Directive 2014/52/EU amending the EIA Directive 2011/92/EU. All potential environmental issues will be assessed during the project's appraisal, including the measures to be taken in relation to the replaced vessels.
Passation des marchés
The promoter has to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, (Directive 2014/24/EU as well as Directive 89/665/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.
Statut
Signé - 30/07/2020
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).