Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20190770
Date de publication: 10 mars 2020

Promoteur – Intermédiaire Financier

ACEA SPA

Lieu

Description

Investments in the integrated water sectors in the territory of ATO 2, Rome area

Objectifs

The project will improve the quality of life of the inhabitants in the city of Rome and 111 surrounding municipalities, by allowing the promoter to upgrade and extend the water and wastewater infrastructures. Furthermore, by increasing the resilience of the water system to climate impacts, the project will contribute to supporting EU Climate Action.

Secteur(s)

  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

Montant BEI envisagé (montant approximatif)

EUR 250 million

Coût total (montant approximatif)

EUR 698 million

Aspects environnementaux

The investment is geared toward upgrading water and wastewater infrastructure (water and wastewater treatment plants, networks, pumping stations), bringing about positive environmental impacts. Compliance with the EU Water Framework Directive (2000/60/EC), Urban Waste Water Treatment Directive (91/271/EEC), and EU and national environmental legislation (notably under EIA Directive 2014/52/EU amending the Directive 2011/92/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC) will be verified during appraisal.

Passation des marchés

The Bank will require the promoter to ensure that contracts for the implementation of the project have been or will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/23/EU where applicable and/or 2014/24/EU where applicable and/or 2014/25/EU where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Statut

Signé - 30/07/2020

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Italie Eau, assainissement