Date de publication: 1 juillet 2020
Promoteur – Intermédiaire Financier
UKRAINELieu
Description
The project builds on the successful Ukraine Early Recovery project (EUR 200m; fully allocated), one of the first measures under the EIB Special Action Plan Ukraine providing EUR 3 billion loans in 3 years. This is the second framework loan supporting priority investments in the recovery areas affected by the conflict in the Eastern region of Ukraine. It will also finance basic infrastructure needs of internally displaced population. Hence the project will allow restoring basic services, rehabilitating key infrastructure and creating an enabling environment for population return and economic recovery.
Objectifs
The aim of the Ukraine Recovery Programme focuses on creating, restoring and improving: - public buildings (including administrative buildings, schools, medical centers and hospitals and other social infrastructure); - governmental roads and bridges; - supply of utilities (water supply and sewerage) in the Donetsk and Luhansk oblasts under control of the Ukrainian Government as well as the four surrounding oblasts (Kharkiv, Dnipropetrovsk, Zaporizhzhia and Kherson) and city councils in other oblasts countrywide enabling them to cope with the impacts of a heavy influx of internal displaced people.
Secteur(s)
- Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
- Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
- Aménagement urbain - Construction
- Transports - Transports et entreposage
Garantie au titre du MPE
This operation is covered by the ELM Guarantee.
Montant BEI envisagé (montant approximatif)
EUR 340 million
Coût total (montant approximatif)
EUR 340 million
Aspects environnementaux
The large majority of the investments foreseen by the project are repairs and refurbishment of damaged infrastructure in sectors mentioned above. Roads (if included) are to be performed within existing rights of way or on new alignment over short sections. Some of these schemes might be subject to EIA under the National EIA Law, which transpose the requirements of the EIA Directive 2011/92/EC and ensures compliance with Ukraine's international obligations under the Association Agreement between Ukraine. Also, the relevant analysis of social risks and impacts of the projects will be duly carried out as part of the appraisal, in accordance with the EIB Social Standards.
Passation des marchés
The promoter is a public entity. The EIB will require the promoter to ensure that implementation of the project will be done in line with the EIB's Guide to Procurement
Statut
Signé - 9/12/2020
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).