Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20200090
Date de publication: 25 août 2020

Promoteur – Intermédiaire Financier

STADTENTWAESSERUNGSBETRIEBE KOELN AOER

Lieu

Description

Investments regarding the wastewater disposal and treatment facilities of the City of Cologne (2021-2025).

Objectifs

The project targets at improving the efficiency and sustainability of Cologne's wastewater services through rehabilitation and upgrading of combined sewer systems (conveying both wastewater and storm water), in line with the Promoter's "Abwasserbeseitigungskonzept 2020" (ABK), as well as the modernisation of wastewater treatment plants.

Secteur(s)

  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

Montant BEI envisagé (montant approximatif)

EUR 150 million

Coût total (montant approximatif)

EUR 350 million

Aspects environnementaux

The project aims at maintaining compliance with the Urban Wastewater Treatment Directive 91/271/EC and Water Framework Directive 2000/60/EC. Several of the construction schemes included in the project might fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending the EIA Directive 2011/92/EU. Environmental impact assessment procedures are carried out, where required, by the competent authorities and mitigating measures are applied as appropriate. Where appropriate, the requirements of the Habitats and Birds Directives (92/43/EEC and 2009/147/EC) are applied. The Bank's appraisal will focus on the Promoter's environmental management capacity to properly apply these EU Directives.

Passation des marchés

The Bank will require the Promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU, as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU), with publication of tender notices in the Official Journal of the EU, as and where required.

Statut

Signé - 2/12/2020

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Allemagne Eau, assainissement