Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20200091
Date de publication: 12 mai 2020

Promoteur – Intermédiaire Financier

MIROVA

Lieu

Description

The operation concerns a minority stake into a wind farm project portfolio (132MW) equity investment in Poland.

Objectifs

The EIB financing for this operation is expected to have an important acceleration and demonstration effect. Indeed, it will be one of the first greenfield renewable energy projects to be financed in Poland as a consequence of the auctions launched by the regulator in late 2018. Besides, the present operation will contribute to the achievement of Polish targets for renewable energy and to the reduction of the CO2 emissions.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

EUR 32 million

Coût total (montant approximatif)

EUR 198 million

Aspects environnementaux

The plants are included in the annex II of the Directive 2014/52/EU amending the Environmental Impact Assessment (EIA) Directive 2011/92/EU, requiring the Environmental Authority to determine the need of an EIA process. In all cases, the plants have been screened out, and the EIA process, including public information, has been carried out, in compliance with the national law, transposing the abovementioned directives.

Passation des marchés

The plants were awarded in the renewable energy auction launched by the Polish government in 2018, being fair, open and competitive, in compliance with the EU Directives on the matter, and the EIB Guide to Procurement. The generation activity, in the Polish electricity market, is liberalized. Procurement of the project components is subject to private procurement regime, and the process carried out by the promoter has been assessed and deemed satisfactory.

Statut

Signé - 28/07/2020

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Pologne Énergie