Référence: 20200144
Date de publication: 15 mai 2020

Promoteur – Intermédiaire Financier

NATIONAL AUTHORITY FOR TUNNELS

Lieu

Description

The project consists of a framework loan to cover urban rail schemes in cities across Egypt, in particular investments in the rehabilitation and expansion of metro and tram systems in Alexandria and Cairo.

Objectifs

The aim is to finance large public transport projects in the cities of Alexandria and Cairo in Egypt, over the next 5 years. Transport in both cities is heavily reliant on road transport, resulting in high levels of pollution, traffic accidents and GHG emissions. Furthermore, the urban road network cannot cope with demand given the size of the cities, leading to widespread transport congestion and constraining economic development.

Secteur(s)

Garantie au titre du MPE

This operation is covered by the ELM Guarantee.

Montant BEI envisagé (montant approximatif)

EUR 1128 million

Coût total (montant approximatif)

EUR 2256 million

Aspects environnementaux

If located in the EU, the public transport investment schemes included in the project, would usually fall under Annex II of the Directive 2014/52/EU and on basis of a screening by a Competent Authority the need for an Environmental Impact Assessement (EIA) would be established. As the schemes may be a mix of rehabilitation works and track extensions, the requirements to ensure compliance with the EIB's Environmental and Social standards will be checked at allocation stage, when the scope is better defined. The promoter has to implement the schemes in compliance with the EIB's Environmental and Social Standards, requiring at least an screening of environmental and social impacts, an Environmental and Social Action Plan, Stakeholder Engagement Plan and an Environmental Management Plan. The project's relevant key documents will be published in line with the EIB's procedures.

Passation des marchés

The promoter has to ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement. It is expected that the main works and supply contacts will be procured via open or restricted procedures with publication in the EU Official Journal.

Statut

Signé - 17/12/2020

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Égypte Transports