Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20200459
Date de publication: 8 décembre 2020

Promoteur – Intermédiaire Financier

UNIVERSITATEA TEHNICA DIN CLUJ-NAPOCA

Lieu

Description

Financing investments of Technical University of Cluj-Napoca.

Objectifs

The project is part of a longer term modernisation programme of the University and in line with EU public policy goals associated with Education and Training 2020, Horizon 2020, and the Urban Agenda for the EU. The project contributes to the European Higher Education Area and the European Research Area by enhancing teaching and learning environments and improving research facilities. The proposed operation provides additional financial resources for the expansion and improvement of both the teaching and research activities and therefore, responds to various needs of the innovation system in Romania, most notably the supply of highly skilled graduates in areas of key economic and social importance and the provision of infrastructure for public research.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 21 million

Coût total (montant approximatif)

EUR 65 million

Aspects environnementaux

The Directive 2011/92/EU amended by 2014/52/EU does not specifically mention the need for an environmental impact assessment (EIA) for buildings relating to education, but it may be that some sub-projects can be regarded as urban renewal projects (Annex II of the European Directive). This will be studied in detail during the appraisal. The possible impact on natural sites will be checked during the appraisal.

Passation des marchés

The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/24/EU as well as Directive 89/665/EEC) as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

Statut

Signé - 27/11/2020

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Roumanie Services Éducation