Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20200550
Date de publication: 26 octobre 2020

Promoteur – Intermédiaire Financier

AVANTCARD DAC

Lieu

Description

Private Finance for Energy Efficiency (PF4EE) collateral agreement for energy efficiency projects promoted by Avantcard in Ireland, in conjunction with a framework loan operation 2020-0551.

Objectifs

The operation, a guarantee to Avantcard DAC under the Private Finance for Energy Efficiency (PF4EE) programme, will support the energy rehabilitation of residential buildings by homeowners, including energy efficiency measures and small-scale renewable energy installations.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
  • Industrie - Construction

Montant BEI envisagé (montant approximatif)

EUR 6 million

Coût total (montant approximatif)

EUR 75 million

Aspects environnementaux

The individual projects under this framework loan (FL) will be small-scale and are expected to bring positive environmental impacts, notably by reducing energy wastage and promoting the use of renewable energy sources for self-consumption by the final beneficiaries, thus lowering greenhouse gas emissions. In addition, the operation will help to extend the useful life of the buildings, which improves the condition of the residential stock overall and minimises construction waste in the long term. In line with EIB policy, the sub-loans will have to comply with EU requirements in the field of environment. The Promoter has to ensure that the sub-projects undertaken by final beneficiaries with the proceeds of the EIB funds should comply with the relevant applicable EU and national legislation.

Passation des marchés

The Promoter has to ensure that the sub-projects undertaken by final beneficiaries with the proceeds of EIB funds comply with the relevant applicable EU and national legislation. The operation will be carried out exclusively in the private residential sector in Ireland, whereby homeowners are the final beneficiaries. Therefore, only small-scale private procurement will take place with no public procurement.

Statut

Signé - 29/10/2021

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Irlande Énergie Industrie