Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20200754
Date de publication: 2 mars 2021

Promoteur – Intermédiaire Financier

E-DISTRIBUZIONE SPA

Lieu

Description

The investment programme to be financed by the Bank comprises schemes for the reinforcement, refurbishment and modernisation of the Promoter's distribution network in Italy during the period 2020-2024.

Additionality and Impact

The Project fully supports national and EU policies on energy and climate, both by developing the infrastructure required to increase the share of renewables in electricity generation, and to make it more resilient to climate change. The investments tackle multiple market failures, in particular they increase the ability of the network to integrate more RES generation capacity and to make it more resilient to climate change. Most of the  investments, especially the ones for improving quality of service will benefit Cohesion regions. In line with the draft EU Taxonomy, electricity distribution infrastructure in the interconnected European System, being on a trajectory to decarbonisation, is considered eligible for climate change mitigation.The economic rate of return is excellent and significantly above the financial rate of return, resulting in an excellent "social benefit". The Promoter is an experienced operator of electricity distribution networks with a sound project implementation structure and a certified environmental management system. With the appropriate conditions in place (please see ESDS), the project is acceptable for financing in environmental and social terms.
The EIB support to this operation is expected to provide a tangible value added, contributing to accelerate the implementation of the underlying schemes, by means of competitive cost of funding, maturity, and disbursement mechanics. The proposed loan structure includes an innovative pricing adjustment mechanics linked to the borrower's achievement of pre-defined sustainable development KPIs. Similar structures may be implemented with other counterparts in other geographies, as a tool to deliver on the EIB climate roadmap.

Objectifs

The investment programme to be financed by the Bank comprises schemes for the reinforcement, refurbishment and modernisation of the Promoter's distribution network across Italy. The investment programme includes (a) new and extension of existing high to medium voltage substations as well as new overhead lines, up to 150 kV, (b) rehabilitation of underground medium voltage networks and substations and (c) remote control and automation investments.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

EUR 600 million

Coût total (montant approximatif)

EUR 1287 million

Aspects environnementaux

Some of the programme schemes may fall under Annex II of Directive 2014/52/EU amending the EIA Directive 2011/92/EU, thus requiring a review by the competent authorities at the planning/consent stage with due regard to the necessity for an environmental impact assessment (EIA). The impacts that can typically be expected from some schemes relate to visual impact, vegetation clearance, collision and electrocution of flying vertebrates, electromagnetic fields, noise nuisance, and disturbance during construction. The appraisal will focus on the Promoter's capacity to implement the programme in line with EIB Environmental and Social Standards and Requirements.

Passation des marchés

The Bank will require the Promoter to ensure that contracts for the implementation of the schemes have been and will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/25/EU where applicable, as well as Directive 92/13/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Statut

Signé - 28/06/2021

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Italie Énergie