Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20210476
Date de publication: 29 septembre 2021

Promoteur – Intermédiaire Financier

MIEJSKIE PRZEDSIEBIORSTWO WODOCIAGOW I KANALIZACJI SA

Lieu

Description

The project covers various investments relating to the development and modernisation of the water and wastewater infrastructure in the City of Wroclaw.

Additionality and Impact

The project covers various investments relating to the development and modernization of the water and wastewater infrastructure in the City of Wroclaw. The project is in line with EU and EIB policy objectives of environmental protection and climate action, and will generate positive externalities in the form of environmental and health benefits. These benefits would not be realised to the same extent without public intervention. EIB provides significant financial contribution by offering longer maturity and flexible customised terms compared to the conditions currently available on the market. EIB financing will help the Borrower to strengthen its funding sources. Thus, EIB's involvement will have an impact on mobilising other financiers and signalling that the project is sound and worth supporting, thereby facilitating the full financing and implementation of the project.

Objectifs

The project aims at enhancing the quality, security and climate change resilience of Wroclaw city's water management system by rehabilitating, upgrading and extending its water supply, wastewater collection and treatment, sludge management and storm water management systems.

Secteur(s)

  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

Montant BEI envisagé (montant approximatif)

PLN 420 million (EUR 92 million)

Coût total (montant approximatif)

PLN 959 million (EUR 210 million)

Aspects environnementaux

The project will contribute to ensuring compliance with key EU directives in the water sector notably the Drinking Water Directive 2020/2184, Urban Waste Water Treatment Directive (91/271/EEC) and the Water Framework Directive (2000/60/EC). Where and if applicable, the requirements of the EIA Directive 2014/52/EU amending the EIA Directive 2011/92/EU and SEA Directive 2001/42/EC will be respected. The Promoter will in such case, prior to utilising any EIB funds, be responsible for transmitting to the Bank the environmental impact assessment (EIA) for publication on its website. For any part of the project that may have an impact on a nature conservation site, the Promoter will be required to provide to the Bank information on the mitigating measures required to comply with the Habitats and Birds Directives (92/43/EEC and 2009/147/EC respectively).

Passation des marchés

The Bank will require the Promoter to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Statut

Signé - 10/12/2021

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Pologne Eau, assainissement