Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20210502
Date de publication: 20 septembre 2022

Promoteur – Intermédiaire Financier

THE COMPANY FOR MANAGEMENT OF THE PUBLIC RAILWAY INFRASTRUCTURE SERBIAN RAILWAYS INFRASTRUCTURE LLC BELGRADE

Lieu

Description

The project consists of upgrading to 160 km/h and track duplication of the section Stalac-Djunis of the line Belgrade-Nis railway line.

Objectifs

The project is part of a framework of schemes targeting upgrading and modernisation of the railway line "Belgrade-Nis" (approx. 230 km). It contributes to the development of economic infrastructure, in particular transport. It is located on the core Trans-European Transport Network (TEN-T), as extended to specific neighbouring countries based on high-level agreements on transport infrastructure. By facilitating rail transport, the project will contribute to the competitiveness of the country's economy. The project will increase the quality, availability and reliability of rail services in Serbia, and contribute to the modal shift from roads to rail. It will generate time and vehicle operating costs savings, reduce the maintenance costs of the infrastructure, improve railway and road safety and present environmental benefits, including climate change mitigation.

Commentaires

The proposed operation is expected to be covered by the comprehensive guarantee granted to the EIB under the Dedicated Investment Window 1 of EFSD+, established by the Neighbourhood, Development and International Cooperation Instrument (NDICI) Global Europe.

Secteur(s)

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Montant BEI envisagé (montant approximatif)

EUR 140 million

Coût total (montant approximatif)

EUR 414 million

Aspects environnementaux

If situated in the EU, the project would fall within Annex I of Directive 2011/92/EU as amended by Directive 2014/52/EU (the EIA Directive) and therefore be subject to an environmental impact assessment (EIA). An EIA was carried out in accordance with the national legislation. Conformity with the EIB environmental and social standards, including concerning the impact on any protected sites will be analysed during the appraisal. The project will require some physical and economic resettlement for construction of the tracks on new alignment. Conformity of the resettlement with the EIB social standards will be analysed during the appraisal.

Passation des marchés

The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

Statut

Approuvé - 17/11/2022

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Serbie Transports