Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20220084
    Date de publication: 19 juillet 2022

    Promoteur – Intermédiaire Financier

    SPECIAL PURPOSE ENTITY(IES)/FUND

    Lieu

    Description

    The project relates to the deployment of a new FTTH (fibre-to-the-home) access network in areas of Poland where very high capacity networks are not available, which will pass 2.1 million households and business premises. The new network will be operated on a wholesale basis selling services with equal terms and conditions to all retail operators.

    Objectifs

    The project is fully in line with the "EU Digital Compass 2030," stating that by 2030 all EU households should have Gigabit connectivity. Therefore, the project is eligible under article 309 point (a) projects for developing less developed regions, for eligible parts, and point (c), Common Interest. Regarding the Bank's Public Policy Goals, the project contributes to Research Innovation and Digital-Rollout of ultra-high speed broadband networks and economic and social cohesion for eligible parts.

    Commentaires

    It envisaged that EIB will provide a loan of up to PLN 825 million.

    Secteur(s)

    Aspects environnementaux

    Investments in fixed telecommunications projects do not fall under Annex I or II of the EIA Directive 2014/52/EU amending the Directive 2011/92/EU. Fixed telecommunications systems have limited environmental effects, apart from disturbances during civil work constructions, which will be mitigated by appropriate measures. Moreover, the Promoter is planning to re-use as much as possible existing infrastructure to minimise the need for civil works. Full environmental details will be assessed during appraisal.

    Passation des marchés

    The Promoter has been assessed by the EIB as being a private company not subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the Promoter is subject to EU public procurement legislation, then the Bank would duly inform the Commission Services and would require the Promoter to apply those rules.

    Statut

    Signé - 27/12/2022

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pologne Télécom