Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20220148
    Date de publication: 1 mars 2023

    Promoteur – Intermédiaire Financier

    SOCIETA ITALIANA TRAFORO AUTOSTRADALE DEL FREJUS SPA

    Lieu

    Description

    The loan will finance rehabilitation works to improve the A32 highway connecting the North-West of Italy to France (Torino-Bardonecchia) via the Frejus Tunnel. The highway is part of the Trans-European Transport Network (TEN-T) Mediterranean Corridor. The project is not expected to lead to any traffic capacity increase and no material interventions are foreseen to occur beyond the existing right of way.

    Additionality and Impact

    The project contributes to the improvement of the TEN-T core network corridor, which currently needs to be upgraded to the required technical standards under TEN-T regulation in terms of road safety and seismic protection. The project achieves several purposes in terms of sustainability and it aims at improving safety and preserving the assets. A significant part of the works on structures, pavement, drainage, ITS and equipment will also contribute to the Climate Action (mostly adaptation but also mitigation) and Environmental Sustainability objectives (reduce pollution and noise).

    In addition, the Project is expected to improve accessibility and decrease road user costs.

    Furthermore the Bank's provision of long term financing provides significant stability to the Borrower's Capex plan.

    Objectifs

    The project comprises a set of individual components with the aim to rehabilitate the A32 highway connecting the North-West of Italy to the South-East of France via the Frejus Tunnel. The components include various types of works, such as: - Alignment on EU directives road related to road safety management (2008/96/EC) and minimum safety requirements for tunnels in the TEN-T(2004/54/EC) ; - Reinforcement of bridges and viaducts structures to safeguard the assets and make them more resilient to future climate change effects; - Pollution control and prevention.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 260 million

    Coût total (montant approximatif)

    EUR 558 million

    Aspects environnementaux

    The pomoter is a private entity and therefore, in principle, not being subject to EU rules on public procurement or concessions. However, if during project appraisal the EIB were to conclude that the Promoter is subject to the EU public procurement legislation, then the Bank would require the Promoter to apply those rules.

    Passation des marchés

    The Project involves multiple components generally expected to be performed within existing rights of way; therefore negative environmental impacts are likely to be minor and temporary. The schemes are likely to fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU, as amended by Directive 2014/52/EU, and therefore be subject to screening. Given the nature of the proposed works, it is unlikely that any of the individual investments will require an EIA which will be verified during the appraisal of the project.

    Statut

    Signé - 19/07/2023

    Milestone
    À l'examen
    Approuvé
    Signé
    7 juin 2023
    19 juillet 2023

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Italie Transports Lignes de crédit