Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20220308
Date de publication: 9 février 2023

Promoteur – Intermédiaire Financier

BLUBRAKE SPA

Lieu

Description

The project will finance Blubrake's research, development and innovation (RDI) activities in the field of anti-lock braking system (ABS) solutions and related business expansion.

Additionality and Impact

The proposed operation will be contributing to the strengthening of the European SMEs competitive advantage qualifying as innovative supporting in particular the Innovation , Digital and Human Capital PPG. The project aims at increasing safety levels for urban mobility for light electric vehicles (LEVs) with reduced frequency of accidents for cyclists and pedestrians. This is achieved through the introduction of an innovative ABS product specifically adapted to LEVs which will also integrate to a digital service platform to manage features like predictive collision, predictive maintenance, and sustainable mobility platform for incentives.

The EIB financing is going to send a positive signal to the private capital markets in Italy to support the promoter's growth. The Loan has a maturity up to 7 years which is absolutely unique in the financial market. Part of the remuneration is based on warrants linked to the valuation of the Company at the Maturity or at the exit event, if earlier. The latter makes the EIB financing very innovative.

Objectifs

The EIB funding will help the promoter to expand its ABS production, which will help to make light electric vehicles, for example e-bikes, safer and more affordable. The project will thus contribute to ease the transition towards green urban mobility.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 10 million

Coût total (montant approximatif)

EUR 22 million

Aspects environnementaux

The initial project RDI activities are expected to be carried out in the existing facility, which is already authorised that will not change their already authorised scope due to the project. An EIA will therefore not be needed as per EIA Directive 2011/92/EU as amended by Directive 2014/52/EU. It could, however, be that the new demonstration assembly/manufacturing plant may require an EIA at the location of project implementation. The Bank's services will verify relevant environmental details during the appraisal.

Passation des marchés

Blubrake has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that it is subject to the EU public procurement legislation then the EIB would duly inform the European Commission and would require the promoter to apply those rules.

Statut

Signé - 21/11/2022

Milestone
À l'examen
Approuvé
Signé
30 août 2022
21 novembre 2022

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Italie Industrie