Date de publication: 4 juillet 2023
Promoteur – Intermédiaire Financier
SJ ABLieu
Description
The project comprises the acquisition of 25 electric high-speed trainsets equipped to operate in Sweden, Norway and Denmark.
Objectifs
The trainsets procured will be equipped to operate in Sweden, Norway and Denmark, and will predominantly be used to provide commercial long distance rail services connecting Stockholm and Gothenburg with other major cities in Sweden and the Nordics. Traffic operations are planned on the routes Stockholm-Gothenburg, Stockholm-Malmö-Copenhagen, Stockholm-Sundsvall-Umeå, Stockholm-Karlstad-Oslo, Gothenburg-Malmö-Copenhagen mainly on the TEN-T network.
Secteur(s)
- Transports - Transports et entreposage
Montant BEI envisagé (montant approximatif)
SEK 3500 million (EUR 296 million)
Coût total (montant approximatif)
SEK 7950 million (EUR 672 million)
Aspects environnementaux
The investments proposed under the project do not fall under either Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU. The need of EIA and/or assessment according to the Habitats Directive for associated facilities (e.g. maintenance workshops or depots) will be analysed during the appraisal. All else equal, the project is expected to have a positive environmental impact by helping the railways to expand their modal share in key sections of the passenger market that are most appropriately met by rail. In addition, the arrangements for the scrapping of the replaced stock will be checked during appraisal. The project is expected to contribute to Climate Action and Environmental Sustainability (CA&ES) objectives, in particular to climate mitigation and climate adaptation and pollution prevention.
Passation des marchés
The Bank will require the promoter to ensure that contracts for implementation of the project have been tendered in accordance with the applicable EU procurement legislation, 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.
Statut
Signé - 13/12/2023
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).