Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20220753
    Date de publication: 18 décembre 2023

    Promoteur – Intermédiaire Financier

    HYPO VORARLBERG BANK AG

    Lieu

    Description

    The project consists in a loan substitute operation in the form of a guarantee covering the mezzanine tranche on a granular SME portfolio originate by Hypo Vorarlberg. The guarantee instrument is designed to facilitate the financial intermediary to finance new loans dedicated to energy efficiency investments and development of highly energy efficient buildings across Austria.

    Additionality and Impact

    By transferring the credit risk of the existing securitised SME and Mid-Cap portfolio, the proposed operation will reduce the risk-weighted assets and thus enable the Promoter Hypo Vorarlberg to release regulatory capital. The capital relief provided will increase the Promoter's credit capacity and allow for the origination of new loans to Final Beneficiaries dedicated to support lending to highly energy efficient building construction and other EE-projects. Such capital relief is not readily available from commercial financiers and therefore unlocks additional lending.

    Energy efficiency investments in buildings suffer from a number market failures (negative CO2 externalities, asymmetric information, and split incentives). As a result of these market failures, investments in energy efficiency are at sub-optimal levels from a socio-economic perspective. The proposed operation contributes to supporting the Austrian government's climate change mitigation ambitions by addressing the suboptimal levels of investments in highly energy efficient building construction and EE-eligible renovation.

    Objectifs

    The proposed guarantee instrument is designed to facilitate the financial intermediary to finance new loans dedicated to energy efficiency investments and development of highly energy efficient buildings across Austria.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 61 million

    Coût total (montant approximatif)

    EUR 150 million

    Aspects environnementaux

    Final beneficiaries will be requested to comply with applicable national and EU legislation, as appropriate.

    Passation des marchés

    Final beneficiaries will be requested to comply with applicable national and EU legislation, as appropriate.

    Statut

    Signé - 6/12/2023

    Milestone
    À l'examen
    Approuvé
    Signé
    4 juillet 2023
    6 décembre 2023

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Autriche Industrie