Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20230228
Date de publication: 2 octobre 2023

Promoteur – Intermédiaire Financier

E-DISTRIBUZIONE SPA

Lieu

Description

The project will finance the second phase of the implementation of an advanced electricity metering system throughout ENEL's concession areas in the period 2023-2024.

Additionality and Impact

The Project contributes to the Bank's lending priority objectives on "Climate Action and Environmental Sustainability" and aligns with the REPowerEU objectives. Its financing will contribute to the "Energy Lending Policy" theme on "innovative technologies and "new types of energy infrastructure". Moreover, the Project is in line with Italy's NECP (National Energy and Climate Plan), which aims to enable and develop demand response, including via dynamic pricing.

The Project can help address the market failure represented by incomplete markets (provision of real time information to end-customers) and it can improve energy efficiency by reducing overall electricity consumption. Economic benefits include energy savings, the avoided costs of replacing less-advanced meters and concentrators, better complaint management, the possibility of new retail services and the participation of end-user in demand response services.

About 41% of the investments will be in cohesion priority regions.

The EIB financing brings a significant financial value added by lowering the Project's cost of funding and offering a tenor longer than the one normally available in the market. The value added provided by the EIB is even more tangible under the current market conditions, perturbed by the Russia-Ukraine conflict.

Objectifs

The aim is to replace the currently installed remotely manageable electricity meters with a further advanced electricity metering system.

Secteur(s)

  • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

Montant BEI envisagé (montant approximatif)

EUR 500 million

Coût total (montant approximatif)

EUR 713 million

Aspects environnementaux

No significant environmental impacts expected. The EIB will evaluate the environmental aspects of the project and will review the relevant promoter's procedures applied to implement the project to ensure that they are in line with EU standards and good industry practice.

Passation des marchés

The promoter has to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/17/EC, and 2014/25/EU where applicable, as well as Directive 92/13/EEC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Statut

Signé - 22/09/2023

Milestone
À l'examen
Approuvé
Signé
7 août 2023
22 septembre 2023

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Italie Énergie